Completed Water

Sweeney WTP – GAC Contactor Addition
  • Value: $36,084,104
  • Completed: 2022
  • Location: Wilmington, NC
  • Summary: Construction of a new Granular Activated Carbon Contactor facility for the existing 35MGD Sweeney Water Treatment Plant. Construction of the contactor facility building including a micropile deep foundation. Installation of contactor feed and backwash pumps. Modification of existing plant piping and electrical systems to accommodate the new facility. Modifications to the existing clearwell and chemical feed systems.
View Project
Canal WTP Clearwell & High Service Pump Station Improvements
  • Value: $46,823,466
  • Completed: 2021
  • Location: Columbia, SC
  • Summary: The Canal WTP is a 50 MGD Drinking Water Treatment Plant servicing the community of Columbia, SC. It has an average output capacity of 50 MGD. The construction project consists of modifications to Clearwells 1 & 2, including the demolition of the existing roofs, installation of drilled shafts, new cast-in-place concrete slabs, walls and decks as well as associated architectural and mechanical components. The project scope also includes the demolition of portions of the existing High Service Pumping Station, the new construction of a High Service Pumping Station, demolition and construction of a new Post Mix Facility, as well as related instrumentation and controls work and associated site work.
View Project
Richard Miller Treatment Plant UV Disinfection Facility
  • Value: $20,200,000
  • Location: Cincinnati, OH
  • Summary: New UV Disinfection facility and all related piping and electrical work at a 250 MGD Water Treatment Plant.
View Project
West Columbia – Lake Murray WTP 9 MGD Expansion
  • Value: $10,900,000
  • Location: West Columbia, SC
  • Summary: Construct new pumping, conveyance, and treatment facilities and improvements to the existing facilities including upgrades to the Raw Water Pump Station, Waste Handling Facilities, and existing Feed Systems. New Carbon Feed System, Raw Water Metering Vault, Flash Mixer, two 4.5 MGD Process Trains (Flocculation Basins, Sedimentation Basins, Filters, and expansion of the Pipe Gallery and Control Building), 2.5 MGD Clearwell and associated Piping, High Service Pump Station, approximately 2,000 feet of 36″ High Service Water Line, and Hypochlorous Acid Generation System.
View Project
Murphree Water Treatment Plant Thickening and Auxiliary Power Project
  • Value: $4,100,000
  • Location: Gainesville, FL
  • Summary: The Project was constructed at the 44-MGD Murphree Water Treatment Plant in Gainesville, Florida. The work included the expansion of the existing chemical building with structural modifications. The work included the construction of a new lime sludge gravity thickener and a new thickened lime sludge pump station. The project also included providing auxiliary power to all motor control centers and other electrical upgrades, and modifications to the plant SCADA system.
View Project
W.J. Hooper Water Production Plant Improvements – Phase II
  • Value: $20,500,000
  • Location: Stockbridge, GA
  • Summary: Expand capacity of the existing water production plant to 20 MGD. Work included demolition and removal of existing Sedimentation Basins, Splitter Box, Raw Water Pump Station, High Service Pumps, and Chemical Storage & Feed Facilities. Construct new Raw Water Intake Structure, Raw Water Pump Station, Raw Water Flow Control & Metering Vault, Rapid Mix Basin, Flocculation & Sedimentation Basins, High Service Pump Station, and Chemical Storage & Feed Facility. Install new Air Release Valves on distribution system. Renovate the existing Administration Building and existing Filters, and replace Filter Effluent Transfer Pumps.
View Project
Ashland Water Treatment Plant Expansion
  • Value: $12,800,000
  • Location: Ashland, KY
  • Summary: Replace four 200 foot long river intake vertical turbine pumps, four high service pumps and one backwash pump, and four existing Leopold filters. Construct chemical feed facilities, four Kruger Actiflo basins with associated piping, backwash tank, electrical building with gen-set and four Leopold filters.
View Project
Kannapolis Water Treatment Plant Upgrade
  • Value: $10,100,000
  • Location: Kannapolis, NC
View Project
Kanawha Water Treatment Plant
  • Location: Kanawha Valley, WV
View Project
Harpeth Valley Water Treatment Plant
  • Value: $12,600,000
  • Location: Harpeth Valley, TN
View Project
Fayette Plateau Water Treatment Plant
  • Value: $8,900,000
  • Location: Fayetteville, WV
  • Summary: Construct new water treatment facility. Work included Superpulsator Clarifier, chemical feed and storage facility, concrete clear well, distribution pumping system, Administration and Lab building and sedimentation basins.
View Project
24th Street Water Treatment Plant Improvements
  • Location: Huntington, WV
View Project
Mason Water Treatment Plant
  • Location: Mason, OH
View Project
East Fork Water Treatment Plant
  • Location: East Fork, OH
View Project
Myrtle Beach Water Treatment Plant Solids Handling System
  • Location: Myrtle Beach, SC
View Project
Hap Cremean Water Treatment Plant
  • Location: Columbus, OH
View Project
Brown County Water Treatment Plant
  • Location: Brown County, OH
View Project

“Adams Robinson managed many subtractors for this project and did a good job coordinating their work and getting the work completed to their standards. We recommend Adams Robinson Enterprises, Inc. on future work.”

Owen W. Callard
Construction Manager
Brevard County Utility Services