Expand capacity of the existing wastewater treatment facility to 3.0 MGD. Construct new force main, reuse and gravity sewer utility piping. Modify existing Preliminary Treatment Structure, Reuse Pumping Chamber and .275 MG Surge Tank. Construct new Surge Transfer Screw Pump Chamber, 1.5 MG Oxidation Ditch, 64′ diameter Secondary Clarifier, 1.0 MGD Tertiary Disc Filters, Reject/Wet Weather Diversion Chamber, Chlorine Contact Chamber, Aerobic Digester, two 5.0 MG pre-stressed concrete Storage Tanks and Office & Control Building.