The Project was constructed at the 44-MGD Murphree Water Treatment Plant in Gainesville, Florida. The work included the expansion of the existing chemical building with structural modifications. The work included the construction of a new lime sludge gravity thickener and a new thickened lime sludge pump station. The project also included providing auxiliary power to all motor control centers and other electrical upgrades, and modifications to the plant SCADA system.