Replace four 200 foot long river intake vertical turbine pumps, four high service pumps and one backwash pump, and four existing Leopold filters. Construct chemical feed facilities, four Kruger Actiflo basins with associated piping, backwash tank, electrical building with gen-set and four Leopold filters.