Deep Bed Filter and ABW/Chlorine Contact Chamber Conversion Project

  • Value: $9,600,000
  • Completed: 2006
  • Location: Orlando, FL
  • Owner: City of Orlando
  • Engineer: Camp Dresser & McKee, Boyle Engineering

Project Description

The Project is located at the 40-MGD Iron Bridge Water Reclamation Facility. The work included the expansion of the Deep Bed Filter structure, installation of a new process control system, a new Splitter Box, conversion of the ABW Filter structure to a Chlorine Contact Chamber, and the rehabilitation of the existing Chlorine Contact Chamber and the existing Post Aeration Basin.

Project Gallery